Previously, the construction of the third road had completed the overall optimization and improvement of the road through four projects: “grey to black, green to color, upper to lower, and more accessible”.
On this basis, the Qingshan District Urban Management Bureau conducted another round of “physical examination” on the tracks along the route.
.